03Services

Authorization and compliance

Packages built from system evidence, not screenshots in a binder.

Overview

RMF and ATO work done by an engineer who can also fix what the assessment finds. Controls are implemented, automated where possible, and documented so the evidence holds up.

For
ISSMs with an ATO due, and contractors facing CMMC Level 2
Typical length
2 to 3 weeks to assess, remediation scoped from the results
Start with
CMMC gap review or ATO package triage
03.1Who it is for

Who calls, and why now.

System owners and ISSMs

An RMF package that keeps coming back from the assessor, or an ATO expiry that is getting close, and implementation statements that match the real system.

Small DIB contractors

An honest read of where they stand against the 110 NIST SP 800-171 r2 requirements before a CMMC Level 2 assessment, and a plan to close the gaps.

Trigger situations
  • A solicitation names CMMC Level 2 and your SPRS score was entered without much evidence behind it.
  • The assessor returned the package with findings your team does not know how to answer.
  • Your ATO expires within the year and the POA&M has grown since the last one.
  • STIG checklists get filled in by hand the week before each assessment.
03.2Problems solved

What is wrong, and what changes.

P1

Implementation statements restate the control text.

Statements that name the component, the setting and where the evidence lives, so an assessor can test them in minutes.

P2

STIG compliance decays between assessments.

STIGs applied through configuration management and checked automatically, so the checklist reflects the system on any given day.

P3

The CUI boundary covers the whole company network.

A boundary drawn around where CUI actually flows, using the asset categories in 32 CFR Part 170, so fewer systems carry every requirement.

P4

POA&M items stay open for years.

Items ranked by risk, each with an owner, a date and the evidence that will close it.

P5

The SPRS score does not match what the systems show.

A rescore from evidence using the NIST SP 800-171 DoD Assessment Methodology, before anyone else does it for you.

03.3Scope

What this covers.

03.1

RMF and ATO package support

System categorization, control implementation statements and SAR preparation tied to real configuration.

03.2

STIG implementation and automation

STIGs applied through configuration management and verified on every build, not by hand once a year.

03.3

Continuous ATO enablement

Controls expressed as pipeline evidence so authorization keeps pace with releases.

03.4

CMMC and NIST SP 800-171 readiness

Gap assessment and remediation for defense contractors ahead of a formal assessment. Readiness only; certification comes from an authorized assessor.

03.5

POA&M triage and closure

Open items ranked by risk and closed with evidence an assessor accepts.

In scope
  • Categorization review under FIPS 199 and CNSSI 1253, the baseline for national security systems
  • SSP and control implementation statements against NIST SP 800-53 r5 baselines and overlays
  • STIG and SRG implementation through configuration management, with automated checks
  • Assessment preparation: evidence index, SAR response, walkthrough rehearsal
  • POA&M triage and closure
  • Continuous ATO evidence design: which controls map to pipeline output
  • CMMC Level 2 readiness against all 110 NIST SP 800-171 r2 requirements and their NIST SP 800-171A assessment objectives
  • CUI boundary and asset categorization
Out of scope
  • CMMC certification. Only an authorized C3PAO conducts Level 2 certification assessments, and DIBCAC conducts Level 3. I am neither.
  • Assessing a company I helped prepare. A firm that prepares you should not also assess you.
  • The authorization decision. The authorizing official grants an ATO.
  • Interpreting contract clauses. Your contracting officer and counsel decide what applies to you.
  • Submitting your SPRS score or CMMC affirmation. A company official does that.
03.4Approach

How the work runs.

  1. 01

    Scope the boundary

    We walk the data flows together and agree what is in the boundary, what supports it and what is out, with the reason for each call written down.

    Output · Boundary diagram and asset list
  2. 02

    Pull the evidence

    I collect what exists today: SSP, diagrams, scan results, STIG checklists, policies and prior assessment results, in whatever state they are in.

    Output · Evidence index
  3. 03

    Review each requirement

    Every control or requirement is marked met, partial or not met against the evidence I saw, with live spot checks on the ones that fail most often.

    Output · Gap register
  4. 04

    Rank and plan

    Gaps are ordered by assessment risk and effort. For CMMC, the plan accounts for which requirements cannot sit on a POA&M.

    Output · Remediation plan and POA&M input
  5. 05

    Fix and automate

    Where the SOW includes it, I rewrite statements, apply STIGs through configuration management and script the checks.

    Output · Updated SSP sections and automation
  6. 06

    Rehearse

    A mock walkthrough run the way an assessor asks for evidence, so the first time your team answers those questions is not the real one.

    Output · Rehearsal notes and final evidence index
03.5Deliverables

What you receive.

D1

Boundary and asset inventory

Diagram, asset list with categories, and the reasoning behind every out-of-scope decision.

D2

Gap register

One row per control or requirement: status, evidence reviewed, what is missing, estimated effort and an owner. PDF and CSV.

D3

Rewritten implementation statements

For the weakest controls, statements that name the component, the setting and the evidence location. These become the pattern for the rest.

D4

Automated STIG checks

Configuration management code plus a scheduled check that writes results in the checklist format your ISSM already uses.

D5

POA&M closure plan

Open items ranked by risk, each with owner, milestone dates and the evidence that closes it.

03.6Standards

Measured against.

NIST SP 800-37 r2

The RMF steps, and what each step owes before the package moves on.

DoDI 8510.01

RMF as DoD applies it: roles, process and reciprocity.

NIST SP 800-53 r5 and SP 800-53A r5

The controls, and the assessment procedures I write statements to satisfy.

DISA STIGs and SRGs

Configuration requirements, applied and checked as code.

NIST SP 800-171 r2 and SP 800-171A

The 110 requirements and the assessment objectives used at CMMC Level 2.

32 CFR Part 170

The CMMC Program rule: levels, scoping, assessment types and POA&M conditions.

DFARS 252.204-7012, -7019 and -7020

Safeguarding covered defense information, and the NIST SP 800-171 DoD Assessment reported in SPRS.

DoD CIO memo, Continuous Authorization to Operate (cATO), February 2022

What a program has to show before an AO will rely on continuous monitoring.

03.7Logistics

Timeline, and what you provide.

Typical timeline
  • ATO and RMF package triageAbout 2 weeks
  • CMMC Level 2 readiness gap reviewAbout 3 weeks
  • Remediation supportScoped from the gap register, phased by month

Assessment durations are typical and go into the SOW after scoping. Remediation speed depends mostly on your side: purchases, policy approvals and change windows.

What you provide
  • Your current SSP, diagrams and policies, in whatever state they are in
  • Recent scan results and STIG checklists
  • An IT owner who can show configuration live on request
  • The ISSM or system owner, or for CMMC the official who will sign the affirmation, at kickoff and readout
  • The contract clauses and CMMC level named in the solicitation
03.8FAQ

Questions buyers ask.

Q01Can you certify us for CMMC?

No. Only an authorized C3PAO conducts a CMMC Level 2 certification assessment, and DIBCAC conducts Level 3. I prepare you for that assessment, and I will not be the one who conducts it.

Q02Should we implement NIST SP 800-171 Revision 3?

CMMC Level 2 assesses against Revision 2 under 32 CFR Part 170. Revision 3 is published, but it is not the assessment basis today. I build to Revision 2 and flag where Revision 3 will change the work later.

Q03Can you get our ATO approved faster?

I can shorten the preparation. The decision belongs to the authorizing official. On the programs I have worked, the delays I saw most came from statements that could not be tested and POA&M items with no owner, and both are fixable.

Q04Can we self-assess for Level 2?

32 CFR Part 170 allows a Level 2 self-assessment for some contracts and requires a C3PAO assessment for others. The solicitation says which applies, and your contracting officer is the one to confirm it.