04Services

Secure software delivery

The factory that builds the system gets the same scrutiny as the system it ships.

Overview

Software factories, containers and supply chains hardened to the DoD DevSecOps reference designs, with provenance a verifier can check without trusting us.

For
Software factories, vendors and primes shipping code to DoD
Typical length
2 weeks to review one pipeline, 4 to 12 weeks to harden
Start with
Pipeline security review
04.1Who it is for

Who calls, and why now.

Program offices running a software factory

To know whether the factory matches the DoD DevSecOps Reference Design before it carries a continuous ATO.

Primes and subcontractors delivering software

Container images that pass hardening review the first time, and SBOMs the government can actually use.

Small vendors selling software into DoD

A NIST SP 800-218 mapping solid enough that the official who signs the secure software development attestation knows what it rests on.

Trigger situations
  • A contract now asks for SBOMs, signed artifacts or a secure software development attestation.
  • Your images keep coming back from hardening review with the same findings.
  • The program wants a continuous ATO, and the assessor asked what the pipeline proves.
  • A runner token or registry credential may have leaked, and nobody can rule it out.
  • You are moving from a hosted CI service to a self-hosted factory inside a government boundary.
04.2Problems solved

What is wrong, and what changes.

P1

Untrusted merge requests run on runners that hold deploy secrets.

Job isolation and protected variables, so code that has not been reviewed never sees production credentials.

P2

Images ship as root with a full OS and hundreds of unused packages.

Minimal base images, non-root users and a scan gate that fails the build on policy.

P3

Nobody can prove that what runs in production came from the reviewed commit.

Signed commits, signed images and provenance attestations verified at deploy time.

P4

SBOMs are generated and never read.

SBOM diffs between releases, with new components and license changes flagged for review.

P5

One long-lived token can push to the registry and deploy to production.

Short-lived credentials scoped per job, issued through OIDC federation where the platform supports it.

04.3Scope

What this covers.

04.1

Software factory and CI/CD hardening

Source control, runners, secrets, registries and deploy paths brought in line with the reference designs.

04.2

Container hardening

Minimal, non-root, scanned and signed images that pass review on the first submission.

04.3

Supply chain security

SBOMs, provenance attestations and dependency controls from commit to registry.

04.4

Signing and key custody

Commit, artifact and image signing designed to survive a key compromise.

04.5

Secure code review

Manual review of the code paths that matter, paired with tuned static analysis in CI.

In scope
  • Source control: branch protection, roles, required reviews and commit signing
  • CI runners: executor type, isolation, network reach, cache and artifact handling
  • Secrets: storage, scoping, rotation and exposure in logs
  • Dependency intake: mirrors, pinning, license and vulnerability policy
  • Container builds against the DoD Container Hardening Guide
  • Artifact registry, signing, SBOM and provenance generation
  • The deploy path to Kubernetes or VM targets, including admission checks
  • Targeted secure code review of authentication, input handling and secrets use
Out of scope
  • Writing application features or owning your pipeline long term
  • Running a software factory as a managed service
  • Iron Bank acceptance, which is the Iron Bank team's decision. I prepare images for that review.
  • Line-by-line audits of large codebases. Code review is targeted at the paths that matter.
  • Signing the attestation. That statement is made by an officer of your company.
04.4Approach

How the work runs.

  1. 01

    Map the factory

    One working session plus read-only access. I draw every path from commit to production, including the ones that skip the pipeline.

    Output · Factory map
  2. 02

    Review the abuse paths

    I look at how a malicious merge request, a stolen token or a poisoned dependency would reach production, within the agreed scope.

    Output · Path notes
  3. 03

    Check against the references

    Each stage is compared with the Reference Design, the Container Hardening Guide and the SSDF practices.

    Output · Gap register
  4. 04

    Harden

    Fixes are written as pipeline templates, runner configuration and policy as code, and merged through your normal review.

    Output · Merge requests
  5. 05

    Prove it

    A release goes through the hardened path, and its signature and provenance are verified independently with the public key alone.

    Output · Verification record
  6. 06

    Hand over

    A readout for engineering and leadership, and a runbook for key rotation and template updates.

    Output · Runbook and readout
04.5Deliverables

What you receive.

D1

Factory map

Every system from commit to deploy, the trust boundaries between them, and which identities can reach each one.

D2

Gap register

One row per gap: the reference section it fails, how exploitable it is, the fix and an owner. PDF and CSV.

D3

Hardened pipeline templates

Reusable CI includes for build, scan, SBOM, sign and promote, with comments explaining each control.

D4

Hardened container baseline

Base images and Dockerfiles built to the Container Hardening Guide, plus the justification file for findings that remain.

D5

Signing and provenance design

Key custody, rotation and revocation runbook, and the deploy-time policy that rejects unsigned artifacts.

D6

SSDF practice mapping

Each NIST SP 800-218 practice mapped to the control or document that supports it, with gaps marked.

04.6Standards

Measured against.

DoD Enterprise DevSecOps Fundamentals

Lifecycle phases, control gates and the software factory model the map is built on.

DoD Enterprise DevSecOps Reference Design: CNCF Kubernetes

Expected platform and tool categories at each factory stage.

DoD Enterprise DevSecOps Playbook

Adoption guidance I use to sequence the fixes.

DoD Container Hardening Guide (DISA)

Base images, non-root builds and how remaining findings are justified.

NIST SP 800-218 (SSDF) v1.1

Practice mapping and attestation preparation.

NIST SP 800-204D

Supply chain security controls inside CI/CD pipelines.

SLSA

A shared vocabulary for where the build stands on provenance and where it can go next.

NIST SP 800-53 r5, CM-14, SR-4 and SA-11

Signed components, provenance and developer testing controls the work produces evidence for.

04.7Logistics

Timeline, and what you provide.

Typical timeline
  • Pipeline security review of one pipelineAbout 2 weeks
  • Hardening one pipeline and its images4 to 6 weeks
  • Factory-wide hardening across several teams8 to 12 weeks, in phases

Typical ranges, fixed in the SOW after scoping. Your merge request review cadence usually sets the pace more than the work does.

What you provide
  • Read-only access to the repository, CI configuration and runner settings
  • A sandbox project or branch where I can open merge requests
  • Maintainer or admin time for settings that are not visible read-only
  • One engineer who owns the pipeline and can answer within a day
  • The contract language driving the work, such as SBOM, attestation or cATO requirements
04.8FAQ

Questions buyers ask.

Q01Do you need admin access to our GitLab or GitHub?

Read-only to start. A few settings are only visible to admins, so either an admin walks me through them on a call or issues a time-limited account that is removed at closeout.

Q02Can you get our images through Iron Bank?

I can harden them to the Container Hardening Guide and prepare the justifications so the first submission is clean. Acceptance is the Iron Bank team's call.

Q03Will you sign our SSDF attestation?

No. Your company's officer signs it. I give you the mapping and the evidence so that person knows exactly what they are attesting to.

Q04Does this replace an application penetration test?

No. This covers how software is built and shipped. Testing the running application is offensive security work, and the two can share one SOW.

Q05Can the work happen in an air-gapped environment?

Yes, planned at scoping. I hold an active Secret clearance, and access to any restricted system goes through your security office.